FoCW and ChiCycle Big Picnic (A Chichester Festival event)

FoCW and ChiCycle supporters met up for a big Summer Picnic at the Amphitheatre on Centurion Way.
One of our Youngest Supporters arriving in a bike trailer
Government guidelines restricted the number of people able to attend but nonetheless we still held an enjoyable picnic event and everyone enjoyed meeting for an outdoor event.
cnullShareing Sandwiches
Torrential rain cleared up just in time for people to ride to the event in dry (ish) weather. Light drizzle at the beginning of the picnic soon cleared up as more people arrived.
Home Built Tandem

Picnickers enjoyed attempting to ride Adam Bells challenge bike where the steering, breaks and pedals all work the opposite way around to a standard bike. I managed to ride about 50cm length before completely loosing balance. Several people manage to ride almost a whole metre.

People arrived with all shapes and sizes of trailers, scooters, bikes, and cargo-trikes. You can see a home built Moulton tandem conversion in the photos. We had 18 people in total attend and a dog. It was fun taking part in the Chichester Festival with our Big Picnic event.

West of Chichester Development Phase 2 Plans Now Available for Consultation

Nick Billington is the the Associate Director of Planning for the West of Chichester Development which is project managed by Tetra Tech Limited. He led the virtual meeting yesterday evening on the 30th June 2021 presenting the Vistry-Miller Phase 2 plans. This included details of the long awaited Southern Access Road plans.
A time table for initial community discussion of the plans was also provided prior to the meeting and is shown below:

CLG stands for Community Liaison Group and if you would like to be included you could try emailing westofchichesterpart2@tetratech.com or by phoning 02382 022 800 (ask to speak to Nick Billington or Ed Allsop)

To view the virtual exhibition of plans for the outline planning for Phase 2 of the West of Chichester Development, you may follow this link: https://vpc.tetratecheurope.com/engage/westchichesterpart2/ a large downloadable PDF version is available here.

A large PDF file containing the 12 drawings accompanying the proposals is available here. An even larger version is available here.

Some FoCW members had trouble viewing this very large file showing all the drawings at once and we have some less detailed clips to give a quick view to those with less powerful PCs

Phase 2 Table Plans_reduced_en 1
Phase 2 Table Plans_reduced_en 2
Phase 2 Table Plans_reduced_en 3
Phase 2 Table Plans_reduced_en 4
Phase 2 Table Plans_reduced_en 5
Phase 2 Table Plans_reduced_en 6
Phase 2 Table Plans_reduced_en 7
Phase 2 Table Plans_reduced_en 8
Phase 2 Table Plans_reduced_en 9
Phase 2 Table Plans_reduced_en 10
Phase 2 Table Plans_reduced_en 11
Phase 2 Table Plans_reduced_en 12

The plans are certainly an improvement on early drafts seen by the FoCW that severed Centurion Way at Bishop Luffa School.

Concerns remain about how cycles will cross the junction between Westgate and Sherbourne Rd. Initial viewings of the drawings indicate that cyclists may be expected to use unsuitable pavements inappropriately converted to shared use cycle tracks. An image clipped from one of the proposals drawings is shown below.

The light grey areas in the image above indicate areas intended for cycling.

 

6 Months of Counter Data Collected on Centurion Way at Bishop Luffa

The Friends of Centurion Way have now collected 6 months of data monitoring how people use the path!

A chart of the paths usage throughout June 2021 is shown below:

 

Blue bars represent Northbound traffic and red bars represent Southbound traffic

Friday the 18th saw remarkably high traffic of 1,191 northbound journeys and 1,001 southbound journeys. This gave a total of 2,192 journeys counted on the 18th June.

A .csv format file containing the data from June 2021 is available on the following link http://centurionway.org.uk/wp-content/uploads/2021/07/2021-07-01.csv

Raw data recorded by the counter in May is available here http://centurionway.org.uk/CounterData/2021-07-01.MEM

The raw data can be read using the IMMotion software available here https://www.im-motion.com/downloads/

Overview of Path Usage over the Past Six Months

CW Path Usage at Bishop Luffa for the first Six Months of 2021

Year

Month

Northbound

Southbound

Total

2021

Jan

12788

13151

25939

2021

Feb

12808

12955

25763

2021

March

16663

16978

33641

2021

April

14095

13878

27973

2021

May

16380

16245

32625

2021

June

17359

16553

33912

Since the start of the 2021 New Year 180,903 journeys had been counted by the evening of July 1st 2021

 

White House Farm Phase 2 Outline Plans including the Southern Access Road are to be Finally Revealed on Wednesday the 30th June 2021

Friends of Centurion Way have campaigned since October 2017 to retain existing good quality walking and cycling facilities on the western side of Chichester.

The initial 2017 Southern Access Road (SAR) proposals involved the removal of the southern end of Centurion Way with cyclists being relocated in both directions onto an unsuitable shared use pavement passing through multiple school bus stops. The proposed shared pavement also included a difficult to negotiate crossing of the northern arm of a new roundabout at Bishop Luffa School. It was planned that people travelling between Chichester and Fishbourne would have to make a lengthy detour to the north to reach a shared pedestrian/cycle SAR crossing and then double back on themselves back past the opposite side of the new Bishop Luffa roundabout to reach the footbridge. This diversion would increase these walking and cycling journeys by just over 276 metres going in either direction! A ChiCycle article detailed these issues here.

The initial poor quality draft plans for the (SAR) appeared to have been rejected by our local planing authorities but this has left the Friends of Centurion Way campaign in a strange limbo situation ever since. For four years Linden Miller have flatly refused to discuss their plans for the SAR claiming that disclosure might compromise commercial negotiations. Finally in late June 2021 we are about to find out what is planned for the SAR that should already be opened to construction traffic if Planning Performance Agreements had been adhered to. Linden Miller are only now readying themselves to disclose the new plans to residents and the wider local community.

Local planing authorities and Linden Miller originally agreed a time table (Planning Performance Agreement) for the development where the SAR would be opened for construction traffic by the completion of the 125th dwelling. This was reported by the Chichester Observer in an article Southern access delay fears at Whitehouse Farm (31st July 2017). It can also be viewed as an informative statement within the Phase 1 outline planning agreement on page 14. It states:

49) The Planning Performance Agreement and Development Delivery Timeline set out a commitment by the applicant to seek to deliver the southern access to the site within a specified timescale. In light of this, the Local Planning Authority anticipates that the southern access will be available for use by construction traffic no later than occupation of the 125th dwelling forming part of the Phase 1 scheme hereby permitted and that the southern access will be available for all traffic no later than occupation of the 225th dwelling as outlined in the agreed Planning Performance Agreement and the associated Development Delivery Timeline. The Local Planning Authority is committed to working with the developer and other relevant bodies with a land interest to deliver this.

Our fear is that the new SAR proposal will look similar to the original draft plan illustrated below.
Draft SAR route from 2017

Big 4th July Summer Picnic at the Amphitheatre

Festival of Chichester Header

3:00 Pm on Sunday July 4th Picnic on Centurion Way

Due to quarantine restrictions being extended by national government into July 2021, please contact summerpicnic@chicycle.co.uk if you intend joining this event. Unfortunately, we are now restricted to the event including a maximum of 30 persons.

Celebrate Centurion Way as being the best walking and cycling leisure route in West Sussex. Bring a picnic and walk or cycle to this family orientated event. Join us at the Amphitheatre Railwaymen sculptures immediately south of Hunters Race bridge. Novelty and cargo bikes will be available to try out.

An png image for flyers is available below and is also available in PDF format on this link.

ChiCycle campaign for better cycling and walking provision around the Chichester area. We encourage creation of even more facilities like Centurion Way to help get people (especially children) outside, happy and active so they can enjoy improved health and well-being. Investing in walking and cycling infrastructure brings significant economic and health benefits as acknowledged by the Department for Transport here. Join us for an enjoyable summer family orientated picnic and help us show how much we value this wonderful walking and cycling route.

Map of location
Map showing location of Picnic

Path Usage May 2021

At the beginning of May 2021, the counter system was undercounting! During bright sunny conditions people passing the counter were not registered.

We have temporarily resolved the issue by boosting the infrared light beam (starting from May 13th). We hope the counter supplier Axiomatic can provide a better long term solution.

On Monday 24th May, a woven dandelion decoration was found hung over the counter obscuring the infrared light beam. Inspection of the counter data indicates the decoration was installed by someone at around 10:30 on Sunday night. No counts of people were recorded over the approximately 7 hour period when the decoration was in place.

A chart of Centurion Way people counts during May 2021 is shown below.

Blue bars represent Northbound Traffic and Red bars represent Southbound Traffic

The counter is situated at the southern end of Centurion Way immediately south of the railway crossing bridge at Bishop Luffa school.

Raw data recorded by the counter in May is available here http://centurionway.org.uk/CounterData/2021-06-02.MEM

The raw data can be read using the IMMotion software available here https://www.im-motion.com/downloads/

Path Usage April 2021

The counter has been missing some counts of path usage on bright afternoons. Data records are reporting errors during these periods of bright sunshine. The FoCW will investigate this issue and hope soon to give a more detailed report of the problem. We hope we can quickly resolve this problem.

The count data as it stands gives the figures as shown in the chart below. This chart is also available as an image link here.

Path Use in April 2021
Blue bars represent Northbound Traffic and Red bars represent Southbound Traffic

The daily count data is also available in CSV format here.

Raw data recorded by the counter in April is available here http://centurionway.org.uk/CounterData/2021-05-04.MEM

The raw data can be read using the IMMotion software available here https://www.im-motion.com/downloads/

Path Usage in March 2021

The Friends of Centurion Way have now collected almost a quarter years figures of path usage starting from Jan 1st 2021. We only completed installation of the counter at lunch time on new years day so missed data from the very first morning of the year. The counter is at the Southern end of Centurion Way just South of the Railway Bridge crossing by Bishop Luffa school.

A chart of path usage during March 2021 is shown below.

Path Usage March 2021
Blue bars represent Northbound Traffic and Red bars represent Southbound Traffic

The highest count was recorded on 16th of March with 682 journeys counted in the North-bound direction and 715 journeys heading in the South-bound direction giving a sum of 1397 journeys being recorded on that day.

Over the whole 31 days of March, a total of 3397 journeys were counted in either direction giving an average of 1085 journeys made on the path each day.

Data giving hourly counts of the paths usage over March 2021 is available in .csv format here 2021March.csv.

Raw data recorded by the counter in March is available here http://centurionway.org.uk/CounterData/2021-04-04.MEM

The raw data can be read using the IMMotion software available here https://www.im-motion.com/downloads/

A chart of the path usage over the first quarter of 2021 is shown below.

First Quarter CW path use 2021
Blue bars represent Northbound Traffic and Red bars represent Southbound Traffic

Over the 90 days of the first quarter of 2021, a total 85343 journeys were recorded in either direction giving an average of 948 journeys recorded each day.

Daily count data recorded by the counter over the first quarter of 2021 is available here 2021FirstQuarter.csv

February 2021 Path Count

On march the first the Friends of Centurion Way downloaded a count of the people using the path over February 2021.

The counter is at the Southern end of the path by Bishop Luffa school and recorded the data shown in the cart below.

February Chart
February Count Chart Data downloaded 1st March
Red bars represent Southbound traffic and the blue bars represent Northbound traffic

A larger image of the chart is available here.

Over the duration of the month February 2021 a total of 25763 individual journeys were recorded by the counter averaging 920 journeys recorded each day over this period.

The peak level of use in February 2021 was on Saturday the 27 which saw 666 people heading Northbound and 707 heading Southbound. This gave a total of 1371 journeys recorded on February 2021 Saturday the 27, by our counter at Bishop Luffa School.

A file containing comma separated values (csv format) with the recorded count given for each hour over February 2021 is available here 2021Feb.csv

The raw data from the counter downloaded on the 1st of March is available here. http://centurionway.org.uk/CounterData/2021-03-01.MEM

Details of the USB Axiomatic Counters used by the Friends of Centurion Way to keep count of the people using the path are available here. https://peoplecounting.co.uk/

Would you consider hiring an Ebike to Ride Centurion Way?

Richard Turnbull of www.brightride.org.uk is conducting some market research to find out if there is demand for hiring out e-bikes in Chichester. If you want to invite friends and family to experience Centurion Way, an e-bike hire scheme might be an appealing prospect for you? Maybe you would be interested in trying out an e-bike yourself?

If you have time, please complete Richards online questionnaire he has created here: https://docs.google.com/forms/d/e/1FAIpQLScdsUS1hSQQ40wXybhA6QhPA8jNaHxYyrP7qePhq1dtd0OaAw/viewform

If you have not already tried riding e-bikes, they feel very much like riding a standard bike except they involve much less physical effort (particularly when going up hills).

A typical E-Bike